Typically, the construction of such facilities is carried out by special companies that have standard designs and layouts, and can also implement projects on an individual order. The step-by-step construction of a townhouse consists of the following:
This is what the construction of a townhouse begins with. The following aspects are necessarily taken into account:
In addition to obtaining construction permits, it is also important to create a large package of papers that will plan the construction process, floor plans, 3D visualization, and technical plan of the future premises.
At this stage, engineering and geological surveys are conducted, technical aspects are worked out, the site is fenced off, main communications are laid, and access roads are constructed.
The process of building a townhouse involves only high-quality materials that will guarantee a long service life of the facility. In addition, at this stage, a number of works on the installation of windows and doors are also carried out. Internal walls and partitions are installed. The floor is made in a rough version, providing for the laying of the floor on the edge of the foundation.
Special attention is paid to the choice of material, as not all modern building materials for a townhouse are suitable for this. For example, bitumen tiles do not withstand snow and rain, so metal tiles are usually considered the best material.
Communications are being laid to ensure energy, heat, and water supply.
This stage is the final one. The craftsmen perform the finishing touches with the subsequent decoration of the premises in accordance with the design and the chosen concept. The turnkey commissioning of the townhouse involves the installation of the necessary furniture and household appliances.
The construction period of a townhouse depends on the area, project features and site conditions. Usually, if we take into account a standard townhouse with an area of 150-200 m², then the completion of construction can be expected in 9-12 months. This period includes absolutely all stages, including the preparation of the site for finishing works.
However, it is worth noting that in some cases, weather conditions, complicated architectural solutions or the laying of communications may become an obstacle. In this case, the duration of the work may increase.
The answer to the question of how much it costs to build a townhouse is also variable, since it depends on the area, selected materials, features of engineering systems, architectural solutions and how quickly the townhouse is built. The costs of laying communications, soil and terrain features are also taken into account.
The final price is usually determined in a detailed estimate, which describes all stages of construction, materials used and how long it takes to build a townhouse.
Get Started Today!
Leave your contact details and within two hours (during business hours) we will help you take the first steps in solving your problem.
LLC «RCC ALBA» © 2010 - 2025
All rights reserved.
Respect other people's work.
Without the written permission of the copyright owner, no part of the data from this site may be copied (text and photographs), screenshots taken, the structure of the site copied, forwarded, stored in an information retrieval system - electronically, mechanically or by any other means of recording.
Terms of Use. CloseСпасибо!
Мы свяжемся с Вами в течении двух часов (в рабочее время).
Закрыть