Calculator

Installation of plastic lining in Kyiv and Kyiv region

Plastic lining is a relatively cheap material that can provide a perfectly flat surface. At the same time, it is excellent for both walls and ceilings. It is also important that you can buy it in a different color scheme, which makes it possible to design any direction.

The Alba construction company is professionally engaged in the installation of plastic lining, offering this service at the best price.

Installation of plastic lining in Kyiv and Kyiv region

Plastic lining

How do we do it:

The installation process of the lining does not imply the presence of debris and dust and is carried out as soon as possible. Sheets are fastened using the following clamps:

  • building brackets of the appropriate size;
  • wide-head nails with anti-corrosion treatment;
  • self-tapping screws;
  • special adhesive compositions.

The plates are connected to each other in a groove-to-groove format. In this case, you can select a specific ornament, using materials of various contrasting or solid colors. One of the advantages of such installation is the practically waste-free production. Plastic lining serves for a very long time, if you do not give it mechanical and thermal effects. The cost of installation is determined by the type of material and installation method.

How do we do it:

Відгуки

Garage Repair on Maksymovycha Street

I was very impressed with the approach to the work and was satisfied with the prices for the work, because other companies offered their services much more expensively. The budget was limited, but all the work was done regardless of certain difficulties and weather conditions.

5/ 5

2025-06-12

More

Insulation of the facade of the house with thermal panels on Brodivska Street

I was very satisfied with the work done and recommended the company to my friends. The house took on a completely different look - it became modern and beautiful.

5/ 5

2025-06-12

More

Manufacturing and installation of gates + wickets for the State Emergency Service of Ukraine (Kyiv)

We are happy with the work. The deadlines are the shortest - we invested in a week (including manufacturing and installation of the gates). The guys are great. The whole work is satisfactory. No complaints at all. Everything is clear, everything is on time. I recommend!

5/ 5

2025-02-12

More

Laying paving slabs and decorating entrance groups

You really helped me out. I had to complete a large amount of work in a short time. Many thanks. The best recommendations. We will continue to cooperate.

5/ 5

2024-12-31

More

Insulation of the roof with polyurethane foam in the village of Petrushky

Thank you very much for the insulation. It became a lot warmer in the booth due to the past fate.

5/ 5

2024-12-16

More

Office repair on the street. Bogdan Khmelnitsky in Kiev

We are very satisfied with the quality of the work. Everything is great!

5/ 5

2024-11-25

More

Repairs in the office of "UkrInterExpedition" LLC

We are satisfied with the speed of work, quality (this is first of all). The prices are moderate. Therefore, you can safely contact "RСС ALBA"

5/ 5

2024-10-10

More

Construction of a fence from decorative block with blinds filling

Everything is great!

5/ 5

2024-09-24

More

Turnkey renovation of an oriental sweets shop

Worked quite effectively. Did a quality job. No complaints. If there are more objects, we will work again.

5/ 5

2024-09-05

More

RСC ALBA - renovation of an apartment in the city of Irpin in the residential complex "Syaivo-2"

I thank Alexey and the guys who did the renovations in my apartment. Everything was done with high quality, on time, everything was done clearly according to receipts and reports. Thank you. I recommend and will use again.

5/ 5

2024-07-25

More

Оцінка 5 базується на 41 відгуках клієнтів

Find out the preliminary cost of the work:

The cost is calculated approximately taking into account the full package of services and the volume specified by you.

A more accurate price will be possible to find out after arriving at the object itself.

The price is affected:

  • - object location;
  • - number and complexity of work;
  • - what material and what technology to work with;
  • - number of preparatory, handling and logistics costs;
  • - due date (compressed or uniform);
  • - prices for building materials;
  • - working time (day / night / around the clock);
  • - ordinary or cramped conditions / work at height;
  • - the presence of good weather;
  • - no interference from external factors (war, strike, blocked streets, significant price increases, natural disasters);
  • - customer decision-making speed;
  • - coherence of work with other contractors;
  • - timely acceptance and payment of work performed.



Choose another service
Close