Calculator

Construction waste removal in Kyiv and Kyiv region

Almost all repair and construction work carried out on a large scale ends with the need to remove the accumulated garbage to the disposal site. It is strictly forbidden to throw them into household garbage containers, and it is rather problematic to cope with the removal on your own. STK ALBA is exactly the company that will help you solve this problem quickly and efficiently.

Construction waste removal in Kyiv and Kyiv region

Construction waste removal

How do we do it:

We provide construction services of various plans, including the collection and removal of garbage. Cooperation with us is beneficial for the following reasons:

  • efficiency and professionalism;
  • convenient payment system;
  • lack of discomfort.

In addition, we provide the service at the best price. The price for them does not hit the budget and allows you to get rid of construction waste more profitably. In the end result, it turns out to be much cheaper than independently renting the necessary equipment and doing all the work.

How do we do it:

Відгуки

Construction of a fence from decorative block with blinds filling

Everything is great!

5/ 5

2024-09-24

More

Turnkey renovation of an oriental sweets shop

Worked quite effectively. Did a quality job. No complaints. If there are more objects, we will work again.

5/ 5

2024-09-05

More

RСC ALBA - renovation of an apartment in the city of Irpin in the residential complex "Syaivo-2"

I thank Alexey and the guys who did the renovations in my apartment. Everything was done with high quality, on time, everything was done clearly according to receipts and reports. Thank you. I recommend and will use again.

5/ 5

2024-07-25

More

RСC ALBA - renovation of an apartment in Kyiv on the street Polar

5/ 5

2024-06-26

More

RСC ALBA - Construction of a fence from the decorative block TM "Golden Mandarin" in the city of Irpin

5/ 5

2024-05-22

More

RСC ALBA - laying paving slabs in the village of Lisne

Everything is fine! Everything was fast. I'm happy.

5/ 5

2024-04-14

More

RСC ALBA - remote support for the project of a private booth near the metro station Krivy Rig

We contacted the company to create a project "from scratch". The project was carried out remotely. There were no difficulties in communication. All our wishes are taken into account. I recommend these professionals to everyone.

5/ 5

2024-03-25

More

RСC ALBA - execution of industrial flooring in Kotsyubynsk

The work is done perfectly. The guys do everything in a timely manner and with high quality. We will continue to work with them. We are glad.

5/ 5

2024-02-07

More

Renovation of a kindergarten in Kyiv

I would like to note 3 main and most important factors after working with Oleksii: 1. Pricing policy - fully invested in the budget that was expected. 2. The quality of work is impeccable. 3. Deadlines - everything turned out clearly and within certain deadlines. Therefore, I recommend the company. We are satisfied.

5/ 5

2024-01-28

More

RСC ALBA - decoration of the facade of the house in the village of Khotyanivka

Many thanks, Oleksiy Oleksiyovych, everything is very prompt, very responsible guys. There will be pennies - we will apply again. thank you

5/ 5

2023-10-24

More

Оцінка 5 базується на 34 відгуках клієнтів

FAQ:

What vehicles do we use to remove construction waste?

  • Gazelle - up to 1.5t
  • Bus - up to 3t
  • Zil - up to 5t
  • Kamaz - up to 10t
  • MAN - up to 20t
  • Scania j400 - up to 40t

Volume and weight of construction waste?

Type of construction waste + volume and weight indicator:

  • Construction waste during dismantling - 1m3 = 1.6t
  • Concrete - 1m3 = 2.4t
  • Reinforced concrete - 1m3 = 2.8t
  • Waste bricks, plaster, tiles - 1m3 = 1.8t
  • Wooden trash (window and door frames, skirting boards, panels) - 1m3 = 0.6t
  • Chipboard, MDF - 1m3 = 0.65t;
  • Linoleum trimmings - 1m3 = 1.8t
  • Cast iron - 1m3 = 0.9t
  • Ruberoid - 1m3 = 0.6t
  • Asphalt road surface - 1m3 = 1.1t
  • Mineral wool (insulation) - 1m3 = 0.2t
  • Sand - 1m3 = 1.65t
  • Clay - 1m3 = 2.74t
  • Supisi - 1m3 = 2.7t
  • Crushed stone - 1m3 = 2t
  • Loam - 1m3 = 2.71t
  • Chernozem - 1m3 = 1.45t
  • Plaster - 1m3 = 1.5t

Find out the preliminary cost of the work:

The cost is calculated approximately taking into account the full package of services and the volume specified by you.

A more accurate price will be possible to find out after arriving at the object itself.

The price is affected:

  • - object location;
  • - number and complexity of work;
  • - what material and what technology to work with;
  • - number of preparatory, handling and logistics costs;
  • - due date (compressed or uniform);
  • - prices for building materials;
  • - working time (day / night / around the clock);
  • - ordinary or cramped conditions / work at height;
  • - the presence of good weather;
  • - no interference from external factors (war, strike, blocked streets, significant price increases, natural disasters);
  • - customer decision-making speed;
  • - coherence of work with other contractors;
  • - timely acceptance and payment of work performed.



Choose another service

Проектирование и дизайн

Close