Calculator

Construction of houses made of aerated concrete in Kyiv and the Kyiv region

Construction of houses made of aerated concrete in Kyiv and the Kyiv region

Aerated concrete blocks are classified as environmentally friendly materials, being a good alternative to conventional bricks. At the same time, this material is characterized by high strength and reliability in the operation of structures. Buildings made from it provide an ideal microclimate, high sound insulation, fire resistance and mold resistance. That is why houses made of aerated concrete are in great demand on the list of orders of the construction company RСC ALBA.

Construction of houses made of aerated concrete in Kyiv and the Kyiv region

Houses made of aerated concrete

How do we do it:

Construction of the house begins after approval of the estimate and design documentation, involving the following stages:
Preparatory – installation of barriers, taking measurements, determining the level of the zero horizon, laying communications.
Delivery of material – we provide the correct storage conditions for aerated concrete blocks.
Construction of the foundation is made of reinforced concrete slabs on a sand bed.
Laying walls - using blocks measuring 375-400 mm for external partitions, and 250 mm for internal partitions.
Reinforcement – a special mesh is used that prevents deformation of the structure.
The ceiling is formed from aerated concrete slabs.
The final stage of construction is the exterior and interior finishing.

How do we do it:

Відгуки

Office repair on the street. Bogdan Khmelnitsky in Kiev

We are very satisfied with the quality of the work. Everything is great!

5/ 5

2024-11-25

More

Repairs in the office of "UkrInterExpedition" LLC

We are satisfied with the speed of work, quality (this is first of all). The prices are moderate. Therefore, you can safely contact "RСС ALBA"

5/ 5

2024-10-10

More

Construction of a fence from decorative block with blinds filling

Everything is great!

5/ 5

2024-09-24

More

Turnkey renovation of an oriental sweets shop

Worked quite effectively. Did a quality job. No complaints. If there are more objects, we will work again.

5/ 5

2024-09-05

More

RСC ALBA - renovation of an apartment in the city of Irpin in the residential complex "Syaivo-2"

I thank Alexey and the guys who did the renovations in my apartment. Everything was done with high quality, on time, everything was done clearly according to receipts and reports. Thank you. I recommend and will use again.

5/ 5

2024-07-25

More

RСC ALBA - renovation of an apartment in Kyiv on the street Polar

5/ 5

2024-06-26

More

RСC ALBA - Construction of a fence from the decorative block TM "Golden Mandarin" in the city of Irpin

5/ 5

2024-05-22

More

RСC ALBA - laying paving slabs in the village of Lisne

Everything is fine! Everything was fast. I'm happy.

5/ 5

2024-04-14

More

RСC ALBA - remote support for the project of a private booth near the metro station Krivy Rig

We contacted the company to create a project "from scratch". The project was carried out remotely. There were no difficulties in communication. All our wishes are taken into account. I recommend these professionals to everyone.

5/ 5

2024-03-25

More

RСC ALBA - execution of industrial flooring in Kotsyubynsk

The work is done perfectly. The guys do everything in a timely manner and with high quality. We will continue to work with them. We are glad.

5/ 5

2024-02-07

More

Оцінка 5 базується на 36 відгуках клієнтів

Find out the preliminary cost of the work:

The cost is calculated approximately taking into account the full package of services and the volume specified by you.

A more accurate price will be possible to find out after arriving at the object itself.

The price is affected:

  • - object location;
  • - number and complexity of work;
  • - what material and what technology to work with;
  • - number of preparatory, handling and logistics costs;
  • - due date (compressed or uniform);
  • - prices for building materials;
  • - working time (day / night / around the clock);
  • - ordinary or cramped conditions / work at height;
  • - the presence of good weather;
  • - no interference from external factors (war, strike, blocked streets, significant price increases, natural disasters);
  • - customer decision-making speed;
  • - coherence of work with other contractors;
  • - timely acceptance and payment of work performed.



Choose another service

Проектирование и дизайн

Close