Good afternoon our potential customer. By following these instructions, you will be able to make a preliminary estimate within 3-5 minutes and understand how much your future repair or construction will cost.
To do this you need:
1. Click the "Calculate yourself" button.
2. Select the required service in the required section.
3. Write the quantity + click the “Add to estimate” button.
4. After all selected services, scroll down to the “Your estimate” section. Check if everything is correct or if you need to add or remove something (to remove it, there is a “Delete” button).
5. Then fill in all the information about yourself and the object + click the “Upload estimate” button. A preliminary estimate in PDF format will be downloaded to your PC (or smartphone), which is convenient to read, check whether all work is indicated and print (if necessary).
If, based on the preliminary estimate, you understand that the prices suit you, then call the indicated numbers and we will arrange a meeting with you at your facility.

1. Dismantling robots

Total: 0 ₴

2. Earthling robots

Preparation robots (10)

Service name Price Volume Total
1. Removing the top plant layer 150 ₴ м2
₴
2. Tree felling within the site, skidding and cutting (up to 60-100 mm) 650 ₴ шт
₴
3. Tree felling within the site, skidding and cutting (up to 300 mm) 850 ₴ шт
₴
4. Tree felling within the site, skidding and cutting (more than 300 mm) 3 300 ₴ шт
₴
5. Stump uprooting and disposal up to 200mm at the base 650 ₴ шт
₴
6. Stump uprooting and disposal up to 500mm at the base 1 100 ₴ шт
₴
7. Stump uprooting and disposal from 500mm to 700mm at the base 1 700 ₴ шт
₴
8. Stump uprooting and disposal from 700mm at the base 2 900 ₴ шт
₴
9. Tree pruning 700 ₴ шт
₴
10. Transferring marks to the bottom of the pit 8 000 ₴ компл.
₴

Sum: ₴

Roboti by hand (18)

Service name Price Volume Total
1. Manual development of sandy soil 900 ₴ м3
₴
2. Excavation of sandy soil manually in a trench 1.2 m deep 1 000 ₴ м3
₴
3. Development of chernozem up to 1 m 800 ₴ м3
₴
4. Development of chernozem from 1 m to 2 m 1 100 ₴ м3
₴
5. Manual development of clay soil 1.2 m deep 1 200 ₴ м3
₴
6. Manual excavation of soil with debris and stones 1 400 ₴ м3
₴
7. Excavation of soil with debris and stones manually in a trench 1.2 m deep 1 600 ₴ м3
₴
8. Manual backfilling of soil 850 ₴ м3
₴
9. Backfilling of soil manually with compaction 900 ₴ м3
₴
10. Compacting layer-by-layer soil manually (when backfilling with machinery) 150 ₴ м2
₴
11. Manual site planning 200 ₴ м2
₴
12. Chernozem layout 150 ₴ м2
₴
13. Manual bottom cleaning with manual throwing (up to 10cm) 150 ₴ м2
₴
14. Adding soil with movement up to 50 m 400 ₴ м3
₴
15. Adding soil with a displacement of 50-100 m 650 ₴ м3
₴
16. Construction of a 100mm sand foundation pit with compaction 180 ₴ м2
₴
17. Construction of a crushed stone cushion for a 100mm pit with compaction 200 ₴ м2
₴
18. Strengthening the slopes of trenches and pits 150 ₴ м2
₴

Sum: ₴

Total: 0 ₴

3. Concrete robots

Total: 0 ₴

4. Stone robots

Total: 0 ₴

6. Wooden structures

Total: 0 ₴

10. Internal order

Total: 0 ₴

11. Fasadi

Total: 0 ₴

12. Metal structures

Total: 0 ₴

13. Improved territory

Total: 0 ₴

14. Helpful robots

Total: 0 ₴

17. Parkani (2m)

Total: 0 ₴

18. Additional robots

Total: 0 ₴

20. Turnkey repair

Total: 0 ₴

Total cost: 0 ₴



Find out the preliminary cost of the work:

The cost is calculated approximately taking into account the full package of services and the volume specified by you.

A more accurate price will be possible to find out after arriving at the object itself.

The price is affected:

  • - object location;
  • - number and complexity of work;
  • - what material and what technology to work with;
  • - number of preparatory, handling and logistics costs;
  • - due date (compressed or uniform);
  • - prices for building materials;
  • - working time (day / night / around the clock);
  • - ordinary or cramped conditions / work at height;
  • - the presence of good weather;
  • - no interference from external factors (war, strike, blocked streets, significant price increases, natural disasters);
  • - customer decision-making speed;
  • - coherence of work with other contractors;
  • - timely acceptance and payment of work performed;
  • - availability of comfortable accommodation for the craftspeople;
  • - availability of a storage area for construction materials and tools.