Sitemap
21-09-2026

Site drainage is a specialized system designed to collect excess moisture and divert groundwater to a safe location, such as a collection well. This prevents moisture from accumulating near the foundation, eroding the soil, or stagnating on the property. Essentially, a foundation drainage system functions as a concealed utility network. Its installation involves setting up pipes, drainage wells, channels, and filtering materials to capture water and redirect it along a specific route. Thus, a drainage system is not merely a perforated pipe buried in the ground, but a comprehensive assembly of components carefully selected and precisely installed.
Drainage systems vary based on installation depth, purpose, and water collection method. The main types include:
Linear and point drainage. This type of system utilizes channels to collect water along pathways, driveways, terraces, or the perimeter apron. It works effectively in specific areas where water tends to accumulate the most.

Installing a drainage system is particularly important for properties with clay soil and a high water table. In such cases, water cannot be absorbed quickly and pools near the building, creating a risk of flooding, cracking, subsidence, and other issues.
It is best to install a drainage system for a private home during the construction or landscaping phase. This is especially advisable in the following situations:
Signs of excess moisture issues include a constantly wet lawn, moss growth on paved surfaces, sinking pathways, and cracks in the perimeter walkway. You should also check for dampness in the basement or the appearance of stains on the walls.
Regarding how to install drainage around a house, the following steps should be noted. First, determine the layout and dig a trench according to the drainage plan—typically, the distance from the house walls should be between 1 and 3 meters. The drainage depth should be 20–50 cm below the level of the foundation base. It is essential to create a slope along the bottom of the trench leading toward the water discharge point.
Next, the drainage materials are installed, which must be wrapped in geotextile fabric. A layer of crushed stone (5–20 mm fraction) is spread on top to a thickness of 10–15 cm. Pipes with a diameter of 110 mm are installed on the crushed stone. Once the pipes are connected using fittings, they are covered with another layer of crushed stone 15–20 cm thick. Afterward, finishing materials can be laid, a paved path or apron constructed, or garden structures installed.
Get Started Today!
Leave your contact details and within two hours (during business hours) we will help you take the first steps in solving your problem.
LLC «RCC ALBA» © 2010 - 2026
All rights reserved.
Respect other people's work.
Without the written permission of the copyright owner, no part of the data from this site may be copied (text and photographs), screenshots taken, the structure of the site copied, forwarded, stored in an information retrieval system - electronically, mechanically or by any other means of recording.
Terms of Use. CloseСпасибо!
Мы свяжемся с Вами в течении двух часов (в рабочее время).
Закрыть