Sitemap
15-12-2025
.jpg)
The construction of structures using this material requires a step-by-step process in a specific sequence. Therefore, it is crucial to adhere to the technology stipulated by construction regulations. A list of other common errors can be summarized as follows:
Ignoring geodetic surveys and incorrectly calculating foundation markings lead to structural defects and misaligned corners. Therefore, it is advisable to engage professionals at this stage.
In this situation, it is important to pay attention to the quality of the material used. Cement must be selected in accordance with the established technology grade. Avoid skimping on materials and using dirty sand, crushed stone, and reinforcing elements in the mortar. It is also strictly prohibited to dilute the ready-mixed concrete with water.
When constructing a structure, it is necessary to prepare the site, mark its perimeter, and clear it of debris and excess vegetation. Failure to maintain a clean surface will result in an unstable and fragile structure.
Professionals recommend using reliable formwork systems with the required density and rigidity. The use of ties and supports is also recommended.
Failure to follow the pouring technology includes using a building mix that is too fluid, with an incorrect water-cement ratio, and ignoring vibration during concreting. This will result in voids, poor adhesion to the reinforcement, and concrete delamination.
This problem will lead to cracks in the structure due to shrinkage caused by temperature changes. Therefore, it is important to plan the installation and execution of this stage in advance.
The mixture is placed in layers, with simultaneous mixing and compaction using a vibrator. This "push[s]" the air out of the concrete.
Concrete work is not recommended in severe frost, windy, or rainy weather. If rescheduling is not possible, then special chemical plasticizers, thermal covers, and other coverings should be used in the concrete mix.
This error leads to the mix drying out, resulting in deformations and other structural defects. It takes at least 4-7 days for the concrete to harden in the formwork. In hot weather, the surface is watered to maintain moisture, and in cold weather, it is insulated.
This error often occurs when doing concrete work yourself. Therefore, it is important to hire professionals who will provide supervision.

Pouring concrete is a physically demanding and time-consuming process. The basic rules for concrete work revolve around following the correct procedures. The tips described above will help you avoid mistakes.
If you're experiencing difficulties with this type of work, it's best to seek help from professional construction companies. They have everything necessary for this process, including specialized equipment. The professionals at RСС ALBA will complete all stages in the correct sequence, providing a quality guarantee and delivering the finished project on a turnkey basis.
Get Started Today!
Leave your contact details and within two hours (during business hours) we will help you take the first steps in solving your problem.
LLC «RCC ALBA» © 2010 - 2025
All rights reserved.
Respect other people's work.
Without the written permission of the copyright owner, no part of the data from this site may be copied (text and photographs), screenshots taken, the structure of the site copied, forwarded, stored in an information retrieval system - electronically, mechanically or by any other means of recording.
Terms of Use. CloseСпасибо!
Мы свяжемся с Вами в течении двух часов (в рабочее время).
Закрыть