The very concept of a frame house should be taken literally. The building is a structure based on a frame, supplemented by materials already prepared for installation. Walls are installed using sheet or molding materials - the type of structure depends on their choice. They are attached inside and outside the frame part. The space between the sheets is filled with insulation in the form of foam, mineral wool, polystyrene. The frame can be either wooden or metal.
Frame houses can be built directly on the site, their installation does not require the installation of a complex foundation. The design feature allows you to get the following advantages:
Frame houses are built quickly and easily. Standard installation steps include several stages. The foundation is usually made in the form of a strip or on piles. Then comes the installation of the frame and its cladding with selected materials. The next stages are the construction of the roof and installation of floors. The finishing touches are the installation of vapor barrier, insulation, interior finishing. You can move into such houses immediately, since they do not shrink.
The types of buildings provide for the features of using specific methods. Among the frame construction technologies that are most popular, the following can be noted:
This method of construction is considered the fastest. The panels are manufactured at the plant and after delivery to the installation site, they are quickly assembled into a structure. Each wall is carefully calculated at the plant, insulated and covered with materials.
The delivery of such blocks requires the use of special equipment. The redevelopment of the building is not provided for, so houses using this technology are typical. The assembly of house components must be carried out by experienced professionals - otherwise no one will guarantee the quality and safety of operation of such a building.
This technology also involves the use of components prepared at the factory. However, they are assembled directly at the construction site. After the structure is completed, it is insulated and sheathed.
In this case, you can save on delivery and special equipment. However, the construction process on the site will be longer. But at the same time, it is possible to make some edits and changes at the construction stage.
In both situations, the cost of building a house will be approximately the same. The surface of the sheathing materials, if necessary, can be used without additional processing, which allows you to significantly reduce the cost of finishing.
Get Started Today!
Leave your contact details and within two hours (during business hours) we will help you take the first steps in solving your problem.
Ready to get started? Free consultation!
Get Started Today!
Leave your contact details and within two hours (during business hours) we will help you take the first steps in solving your problem.
CloseReady to get started? Free consultation!
Get Started Today!
Leave your contact details and within two hours (during business hours) we will help you take the first steps in solving your problem.
Close
LLC «RCC ALBA» © 2010 - 2024
All rights reserved.
Respect other people's work.
Without the written permission of the copyright owner, no part of the data from this site may be copied (text and photographs), screenshots taken, the structure of the site copied, forwarded, stored in an information retrieval system - electronically, mechanically or by any other means of recording.
Terms of Use. CloseСпасибо!
Мы свяжемся с Вами в течении двух часов (в рабочее время).
Закрыть