Ask an expert

Construction of warehouses in Kyiv and Kyiv region

Warehouses - structures and buildings in which storage, unloading and shipment of material assets is carried out. Today, the construction of warehouses is a rather demanded service, while the type of storage and its main characteristics completely depend on the purposes for which it is being built. RSK ALBA provides all stages of work in this direction.

The specifics of warehouse construction take into account several factors, including the type of building materials used, the location, and climate conditions.

Construction of warehouses in Kyiv and Kyiv region

Warehouses

How do we do it:

The algorithm of actions of our specialists will be as follows:

  • drafting and paperwork;
  • site preparation for construction, foundation installation (point, strip, slab);
  • tiered frame assembly using bolted connections;
  • roof installation;
  • sheathing with sandwich panels followed by wall insulation;
  • installation of protective structures and gates, installation of doors, windows and ventilation;
  • conducting communications - heating, plumbing, electricity;
  • interior decoration;
  • cleaning and garbage disposal;
  • delivery of the object on a turnkey basis.

We offer various optimization solutions for the design and construction of warehouses using various types of structures.

How do we do it:

Find out the preliminary cost of the work:

The cost is calculated approximately taking into account the full package of services and the volume specified by you.

A more accurate price will be possible to find out after arriving at the object itself.

The price is affected:

  • - object location;
  • - number and complexity of work;
  • - what material and what technology to work with;
  • - number of preparatory, handling and logistics costs;
  • - due date (compressed or uniform);
  • - prices for building materials;
  • - working time (day / night / around the clock);
  • - ordinary or cramped conditions / work at height;
  • - the presence of good weather;
  • - no interference from external factors (war, strike, blocked streets, significant price increases, natural disasters);
  • - customer decision-making speed;
  • - coherence of work with other contractors;
  • - timely acceptance and payment of work performed.

Ready to get started?
Free consultation!

Get Started Today!

Leave your contact details and within two hours (during business hours) we will help you take the first steps in solving your problem.

Choose another service
Close