Calculator
Back

Construction of the second floor of a garage in a garage cooperative

How we did it:

  • removed the old roofing felt and screed
  • removed the old floor slabs
  • removed the garbage
  • installed the formwork
  • mounted the reinforced frame for the floor
  • poured concrete
  • laid out a reinforced wall made of aerated concrete
  • made a reinforced belt
  • brought wood for rafters and lathing, treated it with fire and bioprotection
  • mounted the beams and lathing
  • insulated the roof and filled the barrier
  • covered the ceiling with OSB slabs
  • installed the window
  • dismantled the removed slabs and loaded them into a dump truck
  • removed the remaining garbage for arranging the entrance
  • concreted the entrance
  • installed the gate

Construction of the second floor of a garage in a garage cooperative

Схожі роботи:

See all company objects

We are always ready to help you solve your problems

Get a free estimate:

Leave your contact details and within two hours (during business hours) we will help you take the first steps in solving your problem.

Проектирование и дизайн

Close