Good afternoon our potential customer. By following these instructions, you will be able to make a preliminary estimate within 3-5 minutes and understand how much your future repair or construction will cost.
To do this you need:
1. Click the "Calculate yourself" button.
2. Select the required service in the required section.
3. Write the quantity + click the “Add to estimate” button.
4. After all selected services, scroll down to the “Your estimate” section. Check if everything is correct or if you need to add or remove something (to remove it, there is a “Delete” button).
5. Then fill in all the information about yourself and the object + click the “Upload estimate” button. A preliminary estimate in PDF format will be downloaded to your PC (or smartphone), which is convenient to read, check whether all work is indicated and print (if necessary).
If, based on the preliminary estimate, you understand that the prices suit you, then call the indicated numbers and we will arrange a meeting with you at your facility.

Self-calculation

Get calculation

1. Dismantling works

Total: 0

2. Earthworks

Total: 0

3. Concrete works

Total: 0

4. Stone works

Total: 0

5. Wells, piling works

Total: 0

7. Wooden structures

Total: 0

8. Roofing device

Total: 0

13. Metal structures

Total: 0

14. Landscaping

Total: 0

15. Ancillary work

Total: 0

16. Other works

Total: 0

18. Tool rental

Total: 0

21. Pies works

21.1. Facades (5)

Service name Price Volume Total
1. Wet facade under lamb (bark beetle) 845 ₴ грн/м2
2. Vent. facade (siding) 975 ₴ грн/м2
3. Vent. facade (ceramic granite) 1 150 ₴ грн/м2
4. Construction of slopes (wet façade) 790 ₴ грн/м.п.
5. Base insulation 425 ₴ грн/м.п.

Sum:

21.2. Roof (5)

Service name Price Volume Total
1. Soft roofing made of roofing felt 355 ₴ грн/м2
2. Soft roofing made of PVC membrane 575 ₴ грн/м2
3. Slate roofing (onduline) 575 ₴ грн/м2
4. Metal roofing 825 ₴ грн/м2
5. Corrugated roofing 750 ₴ грн/м2

Sum:

21.3. Walls and partitions (8)

Service name Price Volume Total
1. Walls and partitions made of brick (gas block) for painting 975 ₴ грн/м2
2. Walls and partitions made of brick (gas block) under vinyl wallpaper 1 035 ₴ грн/м2
3. Walls and partitions made of brick (gas block) for photo wallpaper 1 150 ₴ грн/м2
4. Walls and partitions made of brick (gas block) for wallpaper with a selection of patterns 1 125 ₴ грн/м2
5. Plasterboard partitions for painting 975 ₴ грн/м2
6. Partitions made of plasterboard under vinyl wallpaper 715 ₴ грн/м2
7. Plasterboard partitions for photo wallpaper 760 ₴ грн/м2
8. Plasterboard partitions for wallpaper with pattern selection 790 ₴ грн/м2

Sum:

21.4. Ceiling (10)

Service name Price Volume Total
1. The ceiling is plastered for painting 590 ₴ грн/м2
2. Ceiling plastered under vinyl wallpaper 610 ₴ грн/м2
3. The ceiling is plastered for photo wallpaper 680 ₴ грн/м2
4. The ceiling is plastered for wallpaper with a selection of patterns 620 ₴ грн/м2
5. Suspended ceiling for painting 760 ₴ грн/м2
6. Suspended ceiling under vinyl wallpaper 890 ₴ грн/м2
7. Suspended ceiling under photo wallpaper 890 ₴ грн/м2
8. Suspended ceiling for wallpaper with matching pattern 900 ₴ грн/м2
9. Stretch ceiling 610 ₴ грн/м2
10. Armstrong ceiling 320 ₴ грн/м2

Sum:

21.5. Floor arrangement (3)

Service name Price Volume Total
1. Floor installation on the ground 680 ₴ грн/м2
2. Floor installation on reinforced concrete slabs 415 ₴ грн/м2
3. Floor installation on wooden beams 600 ₴ грн/м2

Sum:

Total: 0

22. Fences (2m)

Total: 0

23. Enlargement

Total: 0

Total cost: 0



Find out the preliminary cost of the work:

The cost is calculated approximately taking into account the full package of services and the volume specified by you.

A more accurate price will be possible to find out after arriving at the object itself.

The price is affected:

  • - object location;
  • - number and complexity of work;
  • - what material and what technology to work with;
  • - number of preparatory, handling and logistics costs;
  • - due date (compressed or uniform);
  • - prices for building materials;
  • - working time (day / night / around the clock);
  • - ordinary or cramped conditions / work at height;
  • - the presence of good weather;
  • - no interference from external factors (war, strike, blocked streets, significant price increases, natural disasters);
  • - customer decision-making speed;
  • - coherence of work with other contractors;
  • - timely acceptance and payment of work performed.