Calculator

Calculator

Price list updated at

24.09.2025

Good afternoon our potential customer. By following these instructions, you will be able to make a preliminary estimate within 3-5 minutes and understand how much your future repair or construction will cost.
To do this you need:
1. Click the "Calculate yourself" button.
2. Select the required service in the required section.
3. Write the quantity + click the “Add to estimate” button.
4. After all selected services, scroll down to the “Your estimate” section. Check if everything is correct or if you need to add or remove something (to remove it, there is a “Delete” button).
5. Then fill in all the information about yourself and the object + click the “Upload estimate” button. A preliminary estimate in PDF format will be downloaded to your PC (or smartphone), which is convenient to read, check whether all work is indicated and print (if necessary).
If, based on the preliminary estimate, you understand that the prices suit you, then call the indicated numbers and we will arrange a meeting with you at your facility.

Self-calculation

Get calculation

1. Dismantling works

Total: 0

2. Earthworks

Total: 0

3. Concrete works

Total: 0

4. Stone works

Total: 0

5. Wells, piling works

Total: 0

7. Wooden structures

Total: 0

8. Roofing device

Total: 0

13. Metal structures

Total: 0

14. Landscaping

Total: 0

15. Ancillary work

Total: 0

16. Other works

Total: 0

18. Tool rental

Total: 0

20. Manufacturing of stairs

Manufacturing of stairs (28)

Service name Price Volume Total
1. Installation of the rafter system 400 ₴ грн/м2
2. Membrane installation 315 ₴ грн/м2
3. Installation of a hydraulic barrier 80 ₴ грн/м2
4. Installation of sheathing 160 ₴ грн/м2
5. Laying insulation (100 mm) 200 ₴ грн/м2
6. Vapor barrier installation 75 ₴ грн/м2
7. Counter rail installation 125 ₴ грн/м2
8. Gutter installation 360 ₴ грн/м/п
9. Installation of ceramic/cement-sand tiles 435 ₴ грн/м2
10. Installation of roof lining 410 ₴ грн/м/п
11. Installation of protection strips 140 ₴ грн/м/п
12. Installation of the end strip 130 ₴ грн/м/п
13. Installation of OSB from inside the attic on the rafters 220 ₴ грн/м2
14. Straight from BEECH (1 m wide and 3 m high) 22 255 ₴ грн/м/п
15. 90 degrees - from BEECH (1 m wide and 3 m high) 23 300 ₴ грн/м/п
16. 180 degrees - from BEECH (1 m wide and 3 m high) 25 700 ₴ грн/м/п
17. Straight from - OAK / ASH - (1 m wide and 3 m high) 24 400 ₴ грн/м/п
18. 90 degrees made of - OAK / ASH - (1 m wide and 3 m high) 27 200 ₴ грн/м/п
19. 180 degrees made of - OAK / ASH - (1m wide and 3m high) 29 700 ₴ грн/м/п
20. Tinting / bleaching / painting + 200 USD/stairs 0 ₴ усл
21. Wardrobe under the stairs made of beech (without shelves) along the front 3 000 ₴ м2
22. Balusters (h-90cm) 4 250 ₴ грн/м/п
23. Separately, 10% is added every 10 cm (for the width of the stairs) 0 ₴
24. If there is no podsutenka (open) - discount 5000 UAH 0 ₴
25. Invitation pole - separately (at customer's request) 0 ₴
26. Metal cladding - need to be specified locally 0 ₴
27. Round/winders - individually 1 350 ₴
28. Installation of railings (the work itself) 0 ₴ грн/м/п

Sum:

Total: 0

21. Pies works

Total: 0

22. Fences (2m)

Total: 0

23. Enlargement

Total: 0

Total cost: 0



Find out the preliminary cost of the work:

The cost is calculated approximately taking into account the full package of services and the volume specified by you.

A more accurate price will be possible to find out after arriving at the object itself.

The price is affected:

  • - object location;
  • - number and complexity of work;
  • - what material and what technology to work with;
  • - number of preparatory, handling and logistics costs;
  • - due date (compressed or uniform);
  • - prices for building materials;
  • - working time (day / night / around the clock);
  • - ordinary or cramped conditions / work at height;
  • - the presence of good weather;
  • - no interference from external factors (war, strike, blocked streets, significant price increases, natural disasters);
  • - customer decision-making speed;
  • - coherence of work with other contractors;
  • - timely acceptance and payment of work performed.
Close