Good afternoon our potential customer. By following these instructions, you will be able to make a preliminary estimate within 3-5 minutes and understand how much your future repair or construction will cost.
To do this you need:
1. Click the "Calculate yourself" button.
2. Select the required service in the required section.
3. Write the quantity + click the “Add to estimate” button.
4. After all selected services, scroll down to the “Your estimate” section. Check if everything is correct or if you need to add or remove something (to remove it, there is a “Delete” button).
5. Then fill in all the information about yourself and the object + click the “Upload estimate” button. A preliminary estimate in PDF format will be downloaded to your PC (or smartphone), which is convenient to read, check whether all work is indicated and print (if necessary).
If, based on the preliminary estimate, you understand that the prices suit you, then call the indicated numbers and we will arrange a meeting with you at your facility.

Self-calculation

Get calculation

1. Dismantling works

Total: 0

2. Earthworks

Total: 0

3. Concrete works

Total: 0

4. Stone works

Total: 0

5. Wells, piling works

Total: 0

7. Wooden structures

Total: 0

8. Roofing device

Total: 0

13. Metal structures

Total: 0

14. Landscaping

14.1. Sidewalk paths (18)

Service name Price Volume Total
1. Preparation of paving slabs for paving slabs 790 ₴ м3
2. Preparing the base for laying trot slabs (crushed stone + sand) 165 ₴ грн/м2
3. Laying paving slabs (FEM) 355 ₴ грн/м2
4. Laying paving stones (clinker) 470 ₴ грн/м2
5. Old town 385 ₴ грн/м2
6. Installing a curb 195 ₴ грн/м/п
7. Radial curb installation 335 ₴ грн/м/п
8. Installing a road curb 240 ₴ грн/м/п
9. Trimming paving slabs or curbs (straight) 195 ₴ грн/м/п
10. Trimming paving slabs or curbs (curvilinear) 250 ₴ грн/м/п
11. Site layout up to 10cm 170 ₴ грн/м2
12. Installation of concrete storm gutters 350 ₴ грн/м/п
13. Installation of plastic rain gutters 290 ₴ грн/м/п
14. Storm drain device 425 ₴ грн/шт
15. Laying flagstone / quartzite 650 ₴ грн/м2
16. Concrete preparation 260 ₴ грн/м2
17. Concrete gutter installation 245 ₴ грн/шт
18. Installation of trays 385 ₴ грн/м/п

Sum:

14.2. Asphalting (5)

Service name Price Volume Total
1. Laying asphalt pavement 1 075 ₴ грн/м2
2. Installing a road curb 240 ₴ грн/м/п
3. Asphalt cutting 175 ₴ грн/м/п
4. Installation of road hatches 835 ₴ грн/шт
5. Construction of road storm water inlets 750 ₴ грн/м.п

Sum:

14.3. Landscape design (7)

Service name Price Volume Total
1. Tree planting 325 ₴ грн/шт
2. Seed lawn (mat + slave) 160 ₴ грн/м2
3. Laying lawn rolls 140 ₴ грн/м2
4. Vibration compaction for lawn 30 ₴ грн/м3
5. Laying agrofibre 60 ₴ грн/м2
6. Laying geotextiles 60 ₴ грн/м2
7. The structure of the “alpine slide” 9 000 ₴ грн/комплекс

Sum:

14.4. Other works (4)

Service name Price Volume Total
1. Making fireplaces 29 800 ₴ грн/шт
2. Installation of street lamps, outdoor lighting poles 795 ₴ грн/шт
3. Construction of gazebos 11 700 ₴ грн/м2
4. Construction of berths 4 125 ₴ грн/м2

Sum:

Total: 0

15. Ancillary work

Total: 0

16. Other works

Total: 0

18. Tool rental

Total: 0

21. Pies works

Total: 0

22. Fences (2m)

Total: 0

23. Enlargement

Total: 0

Total cost: 0



Find out the preliminary cost of the work:

The cost is calculated approximately taking into account the full package of services and the volume specified by you.

A more accurate price will be possible to find out after arriving at the object itself.

The price is affected:

  • - object location;
  • - number and complexity of work;
  • - what material and what technology to work with;
  • - number of preparatory, handling and logistics costs;
  • - due date (compressed or uniform);
  • - prices for building materials;
  • - working time (day / night / around the clock);
  • - ordinary or cramped conditions / work at height;
  • - the presence of good weather;
  • - no interference from external factors (war, strike, blocked streets, significant price increases, natural disasters);
  • - customer decision-making speed;
  • - coherence of work with other contractors;
  • - timely acceptance and payment of work performed.