Good afternoon our potential customer. By following these instructions, you will be able to make a preliminary estimate within 3-5 minutes and understand how much your future repair or construction will cost.
To do this you need:
1. Click the "Calculate yourself" button.
2. Select the required service in the required section.
3. Write the quantity + click the “Add to estimate” button.
4. After all selected services, scroll down to the “Your estimate” section. Check if everything is correct or if you need to add or remove something (to remove it, there is a “Delete” button).
5. Then fill in all the information about yourself and the object + click the “Upload estimate” button. A preliminary estimate in PDF format will be downloaded to your PC (or smartphone), which is convenient to read, check whether all work is indicated and print (if necessary).
If, based on the preliminary estimate, you understand that the prices suit you, then call the indicated numbers and we will arrange a meeting with you at your facility.

Self-calculation

Get calculation

1. Dismantling works

Total: 0

2. Earthworks

Total: 0

3. Concrete works

Total: 0

4. Stone works

Total: 0

5. Wells, piling works

Total: 0

7. Wooden structures

Wooden structures (32)

Service name Price Volume Total
1. Log house made of rounded logs, diameter 200mm 13 125 ₴ грн/м2
2. Log house made of rounded logs, diameter 220mm 13 435 ₴ грн/м2
3. Log house made of rounded logs 140mm thick 12 095 ₴ грн/м2
4. Log house made of rounded logs 180mm thick 12 250 ₴ грн/м2
5. Sharpening of logs and beams 210 ₴ грн/м2
6. Covering walls with rough boards 255 ₴ грн/м2
7. Sheathing the wind and hemming boards with rough boards 280 ₴ грн/м2
8. Covering gables with rough boards 280 ₴ грн/м2
9. Installation of clamps and placement of bolts 70 ₴ грн/шт.
10. Construction of frame walls (installation of the frame, filling with insulation, waterproofing, vapor barrier, antiseptic, fire protection, covering the frame with OSB board on one side) 7 190 ₴ грн/м2
11. Wall cladding with wooden clapboard on a metal frame or on a wooden batten 375 ₴ грн/м2
12. Wall cladding with blockhouse or false beams on a metal frame or on a wooden slat 485 ₴ грн/м2
13. Seam caulking (decorative) 110 ₴ грн/м.п
14. Assembly of beams, purlins, trusses from prepared simple, straight parts 4 500 ₴ грн/м3
15. Complex configuration, arched 7 050 ₴ грн/м2
16. Installation of beams and trusses 295 ₴ грн/м2
17. Finishing ceilings with rough boards 290 ₴ грн/м2
18. Ceiling lining with plywood, OSB board 235 ₴ грн/м2
19. Filing of gypsum board ceilings on a metal frame 355 ₴ грн/м2
20. Lining ceilings with wooden lining on slats 400 ₴ грн/м2
21. Installation of flooring along beams and purlins from 30mm unedged boards 315 ₴ грн/м2
22. Same 40mm thick 330 ₴ грн/м2
23. Laying porous waterproofing 80 ₴ грн/м2
24. Thermal insulation of floors with mineral wool 100mm thick 175 ₴ грн/м2
25. Same 150mm thick 200 ₴ грн/м2
26. Same 200mm thick 225 ₴ грн/м2
27. Installation of wooden entrance stairs with landings, railings and fences 9 615 ₴ грн/м2
28. Installation of internal wooden stairs 0 ₴ грн/к-т
29. Painting (impregnation) of surfaces with tinting compounds (Pinotex, Tikkurila, Belinka) 1 layer 135 ₴ грн/м2
30. Coating surfaces with wax 1 layer 250 ₴ грн/м2
31. Sealing joints with special compounds 195 ₴ грн/м.п
32. Covering joints or walls with linen rope 240 ₴ грн/м.п

Sum:

Total: 0

8. Roofing device

Total: 0

13. Metal structures

Total: 0

14. Landscaping

Total: 0

15. Ancillary work

Total: 0

16. Other works

Total: 0

18. Tool rental

Total: 0

21. Pies works

Total: 0

22. Fences (2m)

Total: 0

23. Enlargement

Total: 0

Total cost: 0



Find out the preliminary cost of the work:

The cost is calculated approximately taking into account the full package of services and the volume specified by you.

A more accurate price will be possible to find out after arriving at the object itself.

The price is affected:

  • - object location;
  • - number and complexity of work;
  • - what material and what technology to work with;
  • - number of preparatory, handling and logistics costs;
  • - due date (compressed or uniform);
  • - prices for building materials;
  • - working time (day / night / around the clock);
  • - ordinary or cramped conditions / work at height;
  • - the presence of good weather;
  • - no interference from external factors (war, strike, blocked streets, significant price increases, natural disasters);
  • - customer decision-making speed;
  • - coherence of work with other contractors;
  • - timely acceptance and payment of work performed.