Calculator

Calculator

Price list updated at

24.09.2025

Good afternoon our potential customer. By following these instructions, you will be able to make a preliminary estimate within 3-5 minutes and understand how much your future repair or construction will cost.
To do this you need:
1. Click the "Calculate yourself" button.
2. Select the required service in the required section.
3. Write the quantity + click the “Add to estimate” button.
4. After all selected services, scroll down to the “Your estimate” section. Check if everything is correct or if you need to add or remove something (to remove it, there is a “Delete” button).
5. Then fill in all the information about yourself and the object + click the “Upload estimate” button. A preliminary estimate in PDF format will be downloaded to your PC (or smartphone), which is convenient to read, check whether all work is indicated and print (if necessary).
If, based on the preliminary estimate, you understand that the prices suit you, then call the indicated numbers and we will arrange a meeting with you at your facility.

Self-calculation

Get calculation

1. Dismantling works

Total: 0

2. Earthworks

Total: 0

3. Concrete works

Total: 0

4. Stone works

Total: 0

5. Wells, piling works

Wells, piling works (16)

Service name Price Volume Total
1. Geological surveys, drilling wells in soils of any complexity, drawing up reports 12 750 ₴ 5-10соток
2. Geological surveys, drilling wells in soils of any complexity, drawing up reports 10 725 ₴ 10-20соток
3. Well construction (drilling, casing running, filter installation) 850 ₴ грн/м/п
4. Construction of prefabricated reinforced concrete wells with mechanized excavation up to 10 m deep 1 435 ₴ шт (кольцо)
5. Preparatory and auxiliary work (transport, carrying materials, moving soil, etc.) 0 ₴ 1к-т
6. Installation of steel bored piles with a diameter of 100 mm and a depth of up to 10 m. 725 ₴ грн/м/п
7. Installation of steel bored piles with a diameter of 150 mm and a depth of up to 10 m. 800 ₴ грн/м/п
8. Installation of bored piles from asbestos-cement pressure pipes with a diameter of 100 mm. 875 ₴ грн/м/п
9. Installation of bored piles from asbestos-cement pressure pipes with a diameter of 150 mm. 875 ₴ грн/м/п
10. At depths greater than 10m 0 ₴
11. Building piles with steel couplings 615 ₴ грн/1стык
12. Reinforcement of bored piles with a diameter of 100 mm. 170 ₴ грн/м/п
13. Reinforcement of bored piles with a diameter of 150 mm. 210 ₴ грн/м/п
14. Manufacturing of reinforced frames 120 ₴ грн/кг
15. Concreting of bored piles with a diameter of 100 mm. 340 ₴ грн/м/п
16. Concreting of bored piles with a diameter of 150 mm. 395 ₴ грн/м/п

Sum:

Total: 0

7. Wooden structures

Total: 0

8. Roofing device

Total: 0

13. Metal structures

Total: 0

14. Landscaping

Total: 0

15. Ancillary work

Total: 0

16. Other works

Total: 0

18. Tool rental

Total: 0

21. Pies works

Total: 0

22. Fences (2m)

Total: 0

23. Enlargement

Total: 0

Total cost: 0



Find out the preliminary cost of the work:

The cost is calculated approximately taking into account the full package of services and the volume specified by you.

A more accurate price will be possible to find out after arriving at the object itself.

The price is affected:

  • - object location;
  • - number and complexity of work;
  • - what material and what technology to work with;
  • - number of preparatory, handling and logistics costs;
  • - due date (compressed or uniform);
  • - prices for building materials;
  • - working time (day / night / around the clock);
  • - ordinary or cramped conditions / work at height;
  • - the presence of good weather;
  • - no interference from external factors (war, strike, blocked streets, significant price increases, natural disasters);
  • - customer decision-making speed;
  • - coherence of work with other contractors;
  • - timely acceptance and payment of work performed.
Close