All work on the installation of such floors is carried out using a dry method. At the same time, the room will maintain an optimal level of humidity throughout the entire time. Other positive aspects of using plasterboard when leveling the Knauf floor include the following:
It is also important that after laying the plasterboard, any floor covering can be laid on its surface. This process does not require any special preparatory work.
Leveling the floor using plasterboard: preparatory work
The dimensions of one sheet of material are 180 x 60 cm. You will need simple tools for the work. These include measuring instruments, a saw for cutting plasterboard, a rule, a construction stapler and a knife. Initially, you should install a deformation tape made of mineral wool or felt along the perimeter of the wall. Next, you need to prepare the base - such preparation involves two methods - on mineral wool and backfill. This ensures alignment in the range from 2 to 16 cm.
If it is necessary to reduce the cost of materials, perlite can be used in a mixture with sand in a ratio of 3:1. If it is necessary to improve the thermal insulation properties, expanded clay can be used.
After the preparatory work, the algorithm of actions will be as follows:
1. Cutting the slabs. Straight lines are cut with a knife, corner parts - with a special saw.
2. Laying the slabs on the backfill. You need to start the process from the door, carefully moving along the plywood paths. It is recommended to place the joints on the logs - this way you can avoid deformations.
3. Preparing the glue. The mixture should be diluted after the material is completely laid on the floors. The resulting liquid should be of medium consistency. It is important to calculate the correct amount, since the substance sets in just 30 minutes.
4. Applying the glue. A notched trowel with a tooth height of 5 mm is used in the work. You need to glue as quickly as possible, evenly distributing the composition over the surface.
5. Laying the second layer of slabs. The laying system provides for shifting this layer by half its size.
6. Fastening the layers of drywall. A stapler with a staple consumption of 20 pieces per square meter is used in the work.
7. Puttying the joints. This is done a day after installation. After complete drying, remove excess putty.
The next step is working with flooring materials. They must be laid on the plasterboard floor in accordance with the manufacturer's instructions.
Get Started Today!
Leave your contact details and within two hours (during business hours) we will help you take the first steps in solving your problem.
Ready to get started? Free consultation!
Get Started Today!
Leave your contact details and within two hours (during business hours) we will help you take the first steps in solving your problem.
CloseReady to get started? Free consultation!
Get Started Today!
Leave your contact details and within two hours (during business hours) we will help you take the first steps in solving your problem.
Close
LLC «RCC ALBA» © 2010 - 2024
All rights reserved.
Respect other people's work.
Without the written permission of the copyright owner, no part of the data from this site may be copied (text and photographs), screenshots taken, the structure of the site copied, forwarded, stored in an information retrieval system - electronically, mechanically or by any other means of recording.
Terms of Use. CloseСпасибо!
Мы свяжемся с Вами в течении двух часов (в рабочее время).
Закрыть