Installation of treatment systems at the plant

Our specialists have completed:

  • dug a pit
  • pumped water out
  • welded and installed a frame of concrete 6m slabs (to eliminate the landslide of the earth and form the dimensions of the pit)
  • laid concrete slabs on the bottom
  • installed containers + welded together
  • poured concrete to hold the tanks
  • backfilled with layer-by-layer compaction
  • tidy up and take out the trash

Installation of treatment systems at the plant

Installation of treatment systems at the plant